Nashua Technology Park: “Hot Office & Industrial Parks”

John Flatley Co. Nashua NH Property

In a recent article in June’s “Millennial Issue” of Business NH Magazine, the Nashua Technology Park is highlighted as one of NH’s “Hot Offices & Industrial Parks” where they examine areas where businesses are growing and expanding.

Business NH Magazine - June 2017 - NTP - Hot Office & Industrial Parks-1

Nashua Technology Park

What makes it a Hot Spot?

Nashua Technology Park (NTP) campus consists of over 750,000 SF of interconnected, energy-efficient Office/R&D buildings within the Gateway Hills campus. The park and location have become a key component in the growth of numerous leading high-tech companies including Dell, Skillsoft, Amphenol TCS, Benchmark Electronics, Plexxi, DataGravity, Parallel Wireless and more.

The John Flatley Company supports the growth of each and every tenant and encourages aspiring entrepreneurs to start their own business ventures and grow within this high-tech community environment. The Nashua Technology Park is home to annual Flatley Challenge Startup Competition and biweekly Startup Pitch Nights geared toward startups and emerging businesses in the fields of IT, communications, data storage, connectivity, robotics, clean tech, medical devices, digital health, mobile app design, life sciences and other leading-edge technologies. These startups receive the opportunity to cowork in the Flatley Innovation Center. Coworking with innovators in a suburban setting is a unique and collaborative way to work on building a company alongside other innovators.

2017 Gateway Hills Slide Deck7

Those who are lucky enough to work at the Nashua Technology Park have an array of amenities to choose from. Gateway Hills has an on site Health Club, Homewood Suites Extended Stay Hotel, multiple conference facilities, full service cafeteria, outdoor patio/dining options, game rooms, outdoor athletic field, tennis court, basketball court, organized sports leagues and various green initiatives including electric car charging stations. Gateway Hills has a scenic paved trail network as well as Cross Country Trails perfect for Mountain Biking and Snow Shoeing/Cross Country Skiing in the Winter. Additionally, Gateway Hills provides a fresh approach to living with their community garden and apple orchard.

2017 Gateway Hills Slide Deck (for slide deck program)42017 Gateway Hills Slide Deck (for slide deck program)6b

There is a real sense of community @ Gateway Hills. Gateway Hills offers year-round community events and networking opportunities, including: Summer Concert Series, an Annual 2 Mile Trail Race, Fall Festival, Job Fairs, Car Show, Lunch & Learn Workshops, seminars, wellness programs, blood drives, training programs and more! Through a unique Live, Work, Play, Shop lifestyle, Gateway Hills has become a popular spot to move to in Nashua, NH.

2017 Gateway Hills Slide Deck5

Read article here:

Business NH Magazine - June 2017 - NTP - Hot Office & Industrial Parks-2

10 Ways to Celebrate Dad this weekend @ Gateway Hills

Celebrate all of the Dads in your life this weekend with fun activities at @ Gateway Hills

hope-house-press-251255

10 Ways to say Thank You for being the Best Dad Ever:

IMG_07 (for web)

 

1. Practice your short game with our

new putting green at Building 200 @Gateway Hills.

grill station

 

2. Get the family together & fire up the

grill at one of our Grilling Stations

@ Gateway Hills for a Dad’s Day BBQ.

IMG_5220

 

3. What says Dad more than Rock,

R&B, and Soul Music? Make plans

to come to the Free Brickyard Blues concert,

@ Gateway Hills on June 29th.

If he’s into Country Music, we’ve

got that covered too! Register for

the Tom Dixon concert July 27th

and Annie Brobst Concert August 16th!

craft beer cellar (for web)

 

Image: Craft Beer Cellar

4. Visit Craft Beer Cellar and check out

the unique quality selections of beer

that Dad is sure to enjoy @ Tara Commons.

Trail

 

5. There is nothing like the scenic trails

at Gateway Hills! Go with Dad for a

Walk/Run this weekend on our

Paved Trail Network or go Mountain

Biking on the Cross Country Trails.

KylehoffmanPhotography_GHHC_LOW_RES-69

 

6. Take Dad to a TRX class  at

@ The Gateway Hills Health Club this Sunday!

005_140624_Pressed_Cafe

 

7. Lunch at Pressed Café @Tara Commons

– Have it your way with breakfast all day!

pic_742x493-300x199

 

Image: Orange Theory

8. Attend an Orange Theory Fitness class

with Dad, with their free one hour workout

deal you won’t want to miss @ Tara Commons

DCIM100MEDIADJI_0003.JPG

 

9. Play a game of Basketball, Soccer,

or Tennis at our Athletic Field @ Gateway Hills

pool

 

10.  Do you live at Tara Heights?

Treat Dad with a day at the pool or

rent out the club house and throw

him a surprise party with all

your family and friends!

A great way to say “Thanks Dad”.

Gateway Hills 3rd Annual 2 Mile Trail Race

2017 Trail Race Logo_KM2

IMG_6141

On your Mark, Get Set, GO!

Race Results

1st Place: Jeremy Melendez, Age 14, 13:44 min

2nd Place: Helen Stamas, Age 25, 13:55 min

3rd Place: Herinell Linares, Age 28, 15:02 min

first place (thumbnail)
shoe

Team Challenge:

Hilton Hotties

Kid’s Challenge:

8-13: Nico Frioni, Age 8, 19:11 min

Under 7: Shane McDermott Age 7, 20:34 min

Beneficiary

Annual Fishing Derby

All proceeds will benefit the Rotary Club of Nashua’s

Annual Fishing Derby – a fun day for children with various

types of disabilities. The Rotary provides a fully stocked

pond, cookout and respite for devoted and deserving parents.

rotaryfishing derby photo (from rotary site)

image: Nashua Rotary

DSC_0175

RUNNERS & WALKERS OF ALL AGES PARTICIPATED!

MUSICIMG_6123 RAFFLES &PRIZESIMG_6239
FOOD & REFRESHMENTSIMG_6228 SEE ALL PHOTOSDSC_0184

THANK YOU SPONSORS

trail race flyer

“Installing Fences & Sprinkler Piping” at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

June 5 – June 9, 2017

Restaurant Progress underway @ Gateway Hills. See last week’s updates at +Gateway Hills Bar & Grill.

 

Microsoft Word - 6-8-17 Update.docx

Installing swing gates for emergency exit.

 

Microsoft Word - 6-8-17 Update.docx

Installing dumpster enclosure doors.

 

Microsoft Word - 6-8-17 Update.docx

Installing sprinkler piping & heads for fire protection system (seen above and below).

Microsoft Word - 6-8-17 Update.docx

 

We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?

Follow our progress blogs here:http://gatewayhills.blogspot.com/

Like us on Facebook: Gateway Hills

Follow us on Twitter: @GatewayHills

Follow us on LinkedIn: The John Flatley Company

Like us on Instagram: Gateway Hills

Follow us on Pinterest: GatewayHills

May 30-June 2, 2017

Restaurant Progress underway @ Gateway Hills. See last week’s updates at +Gateway Hills Bar & Grill.

May 30th

 Installing pressure treated rails for guardrail

Microsoft Word - 5-30-17 Update.docx

Microsoft Word - 5-30-17 Update.docx

  •  Hydroseeding remaining areas along Innovative Way

Microsoft Word - 5-30-17 Update.docx

Microsoft Word - 5-30-17 Update.docx

May 31st

  • Installing pressure treated rails for guardrail around patio
  • Installing gate posts for emergency exit (gates to be fabricated and installed next week) 
  • Installing dumpster enclosure (gates to be fabricated and installed next week)

Microsoft Word - 5-31-17 Update.docx

Microsoft Word - 5-31-17 Update.docx

Microsoft Word - 5-31-17 Update.docx

  • Installing break metal along top of parapet

Microsoft Word - 5-31-17 Update.docx

  • Wiring electric meter

Microsoft Word - 5-31-17 Update.docx

June 1st- June 2nd

  • Installing galvanized steel canopies at front of restaurant.

Microsoft Word - 6-1-17 Update.docx

  • Installing water meter, pressure reducing valve, and backflow preventer

Microsoft Word - 6-1-17 Update.docx

We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?

Follow our progress blogs here:http://gatewayhills.blogspot.com/

Like us on Facebook: Gateway Hills

Follow us on Twitter: @GatewayHills

Follow us on LinkedIn: The John Flatley Company

Like us on Instagram: Gateway Hills

Follow us on Pinterest: GatewayHills

 

“Patching Pavement & Planting” at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

May 15-May 26, 2017

Restaurant Progress underway @ Gateway Hills. See the last two weeks of updates at +Gateway Hills Bar & Grill.

Microsoft Word - 5-18 to 5-19 Update.docx

May 15-19

  • Setting forms for sidewalks & dumpster pad.
  • Installing metal mesh reinforcement, pouring concrete, shaping edges & control joints.
  • Installing ADA warning plates @ handicap ramp.

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

 

  • Cutting-in of electrical service.
  • Rough install of fire alarm panel box, pull stations, photocell for site lighting.

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

Microsoft Word - 5-15-17 Update.docx

  • Removing forms & cleanup.
  • Screening loam
  • Backfilling & compacting bank run gravels around walkways.

Microsoft Word - 5-16 to 5-17 Update.docx

Microsoft Word - 5-16 to 5-17 Update.docx

  • Patching pavement binder at trench locations & walkways.
  • Installing cape cod berm around property.
  • Installing remaining loam.
  • Installing fabric on slope of pond.
  • Installing remaining irrigation stone for rip-rap & check dam.

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

  •   Planting trees & bushes.

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

Microsoft Word - 5-18 to 5-19 Update.docx

May 22-26

  • Planting trees & bushes.
  • Installing mulch in garden beds.

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

  • Installing 800 Amp. Panel & breakers.
  • Connecting secondaries to transformer.
  • Installing electric meter.

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

  • Installing steel I-beam posts for guardrail.

Microsoft Word - 5-22 to 5-26 Update.docx

Microsoft Word - 5-22 to 5-26 Update.docx

We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?
Visit:http://www.gateway-hills.com/new-restaurant-site/
Follow our progress blogs here:http://gatewayhills.blogspot.com/

Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills

“Backfilling & Installing” at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

May 8-May 12, 2017

Restaurant Progress underway @ Gateway Hills. See last week’s update at +Gateway Hills Bar & Grill.

May 8, 2017

Microsoft Word - 5-8-17 Update.docx

Prepping front sidewalk.

 

Microsoft Word - 5-8-17 Update.docx

Backfilling patio retaining wall (seen above and below).

Microsoft Word - 5-8-17 Update.docx

 

Microsoft Word - 5-8-17 Update.docx

Shutoff valves installed and capped for future RTU’s.

 

Microsoft Word - 5-8-17 Update.docx

Gas piping installed through roof to RTU’s  (seen above and below).

Microsoft Word - 5-8-17 Update.docx

 

May 9, 2017

Microsoft Word - 5-9-17 Update.docx

Backfilling & grading patio retaining wall.

Microsoft Word - 5-9-17 Update.docx

Installing insulation & plywood in preparation for panel installation.

May 10-12, 2017

Microsoft Word - 5-10 to 5-12 Update.docx

Detention basin work.

 

Microsoft Word - 5-10 to 5-12 Update.docx

Installing erosion control blankets, erosion stones, loam, and sand.

Microsoft Word - 5-10 to 5-12 Update.docx

Installing insulation & plywood in preparation for panel installation, Wiring RTU’s, Installation of panel box, and Final wiring & trip plates installed on site lighting (seen above and below).

Microsoft Word - 5-10 to 5-12 Update.docx

 

Microsoft Word - 5-10 to 5-12 Update.docx

EIFS work completed on Northwest wall. Installing foam, rasping, installing base coat, followed by finish coat.

 

Microsoft Word - 5-10 to 5-12 Update.docx

Installing new transformer on to concrete pad.

 

We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?
Visit:http://www.gateway-hills.com/new-restaurant-site/
Follow our progress blogs here:http://gatewayhills.blogspot.com/

Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills

“Primaries & Secondaries” at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

May 1-May 5, 2017

Last week’s progress on the Restaurant Site @ Gateway Hills. See what was done last week at +Gateway Hills Bar & Grill.

May 1, 2017

Microsoft Word - 5-1-17 Update.docx

Backfilling primary utility trenches.

Microsoft Word - 5-1-17 Update.docx

Backfilling primary utility trenches.

Microsoft Word - 5-1-17 Update.docx

Backfilling secondary utility trenches.

Microsoft Word - 5-1-17 Update.docx

Excavation for primary roof drains.

Microsoft Word - 5-1-17 Update.docx

Excavation for primary roof drains.

Microsoft Word - 5-1-17 Update.docx

Excavation for secondary power inside of building.

Microsoft Word - 5-1-17 Update.docx

Grounding wires installed in preparation for transformer pad.

Microsoft Word - 5-1-17 Update.docx

Conduits installed into building from transformer.

Microsoft Word - 5-1-17 Update.docx

New poles are on the right side.

Microsoft Word - 5-1-17 Update.docx

Building forms for retaining wall footings, installation of rebar for footings and peirs.

Microsoft Word - 5-1-17 Update.docx

Setting grade pitch of pipe alongside Hiltz.

May 2, 2017

Microsoft Word - 5-2-17 Update.docx

Backfilling of primary & secondary trenches.

Microsoft Word - 5-2-17 Update.docx

Installing grade stakes for front walkway.

Microsoft Word - 5-2-17 Update.docx

Strip forms from footings. Building forms for retaining wall, installing rebar & foundation ties.

Microsoft Word - 5-2-17 Update.docx

Installing primary roof drain pipe.

Microsoft Word - 5-2-17 Update.docx

Installing primary roof drain pipe.

May 3- May 4, 2017

Microsoft Word - 5-3 to 5-4 Update.docx

Excess fill cleanup. Gravel & fabric installed up to top of footing. Final grade & compact of primary & secondary trenches.

Microsoft Word - 5-3 to 5-4 Update.docx

Strip forms from walls.

Microsoft Word - 5-3 to 5-4 Update.docx

Strip forms from walls.

Microsoft Word - 5-3 to 5-4 Update.docx

Installing conduit & sweeps to pole.

Microsoft Word - 5-3 to 5-4 Update.docx

Installing pull box for secondaries outside of building. Connecting conduits through foundation wall.

Microsoft Word - 5-3 to 5-4 Update.docx

Setting transformer pad.

May 5, 2017

Microsoft Word - 5-5-17 Update.docx

Backfilling of interior trenches.

Microsoft Word - 5-5-17 Update.docx

Backfilling of interior trenches.

 

We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?

Visit:http://www.gateway-hills.com/new-restaurant-site/
Follow our progress blogs here:http://gatewayhills.blogspot.com/

Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills

Pressed Café on Chronicle

the cronicle

WCVB Channel 5 Boston recently featured Pressed Café on Chronicle. Burlington’s newest restaurant that is quickly becoming most popular as well! Located in Burlington and Nashua (Tara Commons @ Gateway Hills), Pressed Café is known for its fresh, flavorful, and fast Mediterranean inspired food. Pressed Café prides itself on its fast, yet healthy food. They challenge the negative connotation with “fast food”  by providing a wide variety of fresh, wholesome and quality dishes  prepared within a “3-5-minute ticket time”.

Click here to watch Video

At Gateway Hills, Nashua we are a community where smart business connects with healthy living and Pressed Café is a perfect fit. It is a place where you can enjoy fresh and healthy ingredients, while maintaining your fast-paced work schedule.  Stop by Pressed Café on your next lunch break. We promise, you won’t be disappointed.

“Coring foundation & Core Drilling” at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

April 24-April 28, 2017

Last week’s progress on the Restaurant Site @ Gateway Hills. See what was done last week at +Gateway Hills Bar & Grill.

Aprl 24-25

Microsoft Word - 4-24 to 4-25 Update.docx

Grading of retention pond, Irrigation stone placed around outlet structure (seen above and below).

Microsoft Word - 4-24 to 4-25 Update.docx

 

April 26

Microsoft Word - 4-26-17 Update.docx

Saw cutting for primary distribution from pole to transformer.

 

Microsoft Word - 4-26-17 Update.docx

Spreading loam (seen above and below).

Microsoft Word - 4-26-17 Update.docx

 

Microsoft Word - 4-26-17 Update.docx

Removing faulty trenching patch & reinstalling.

 

April 27

Trenching for primary.

Excavating for transformer pad.
Excavating for core drilling.
Saw cutting for secondary trenching.
(Seen in below 3 images).

Microsoft Word - 4-27-17 Update.docx

Microsoft Word - 4-27-17 Update.docx

Microsoft Word - 4-27-17 Update.docx

 

Microsoft Word - 4-27-17 Update.docx

Coring foundation for secondaries, phone, and cable into building (seen above and below).

Microsoft Word - 4-27-17 Update.docx

 

 

April 28

Microsoft Word - 4-28-17 Update.docx

Trenching for secondaries, spreading sand for conduits at base of trench.

 

Microsoft Word - 4-28-17 Update.docx

Installing remaining ipe siding at entryway.

 

Microsoft Word - 4-28-17 Update.docx

Installing conduit & sweeps for primary, phone, & cable (seen above and below).

 

Microsoft Word - 4-28-17 Update.docx

 

We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?

Visit:http://www.gateway-hills.com/new-restaurant-site/
Follow our progress blogs here:http://gatewayhills.blogspot.com/

Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills